CAH-SVX01B-EN 47
Installation - Mechanical
3. Bottom of unit base elevation is ½ inch lower than edge of duct opening in bottom of unit.
During unit installation on roof curb, either raise field provided duct per Option A (see Figure 41)
or add additional gasket material to compensate for the ½ inch offset per Option B (see
Figure 42).
Component Installation Requirements
WARNING
Hazardous Voltage with Capacitors!
Disconnect all electric power, including remote disconnects and discharge all motor start/run
capacitors before servicing. Follow proper lockout/tagout procedures to ensure the power
cannot be inadvertently energized. For variable frequency drives or other energy storing
components provided by Trane or others, refer to the appropriate manufacturer’s literature for
allowable waiting periods for discharge of capacitors. Verify with an appropriate voltmeter that
all capacitors have discharged. Failure to disconnect power and discharge capacitors before
servicing could result in death or serious injury.
Each component in the Custom air handler may have installation requirements that could affect the
unit’s performance.
Note: For components included in the unit but not included in this manual, reference the
component manufacturers specific Installation, Maintenance, and Operation manual.
Copies of these manuals are either included in the package with this unit IOM or are attached
to the components mounted in the unit.
Figure 41. Field-supplied duct connection option details -
Option A
Figure 42. Field-supplied duct connection option details -
Option B
Unit
wall
Unit floor
Supply opening
in floor
Edge of
supply
opening
Unit
base
Roof
curb
Bottom of
unit base
elevation
Field-
supplied
duct
Gasket
Building roofing
and structure
may vary per job
0.5
Additional 1/2 inch of
duct length option
Not to scale.
Option A
Note: Bottom of unit base elevation is 1/2 inch lower than edge of duct
opening in bottom of unit. During unit installation on roof curb, either
raise field-provided duct or add additional gasket material to
compensate for the 1/2 inch offset.
Unit
wall
Unit
base
Unit floor
Supply opening
in floor
Additional
1/2 in. gasket
Edge of
supply
opening
Bottom
of unit
base
elevation
Building
roofing
and structure
may vary per job
Note: Bottom of unit base elevation is 1/2 inch lower than edge of duct
opening in bottom of unit. During unit installation on roof curb, either raise
field-provided duct or add additional gasket material to compensate for
the 1/2 inch offset.
Option B
Additional 1/2 inch
of gasket material
option. Not to scale.
0.5
Field-
supplied
duct
Gasket
Roof
curb