Installation: Piping
GMND-SVX01B-EN 21
Installation: Concentric Vent
Te r m i n a l
Horizontal Termination
Select a location on an outside wall for the vent terminal.
In most applications, the terminal should be on level with
the flue outlet of the unit, less 1/4 inch per foot pitch for
condensate drainage toward the outside of the building
(see Figure 13, p. 22).
Figure 9. Vertical intake/vent installation
Figure 10. Vertical vent installation
Figure 11. Horizontal intake/vent locations
Figure 12. Horizontal vent installation
WARNING
Hazardous Service Procedures!
The maintenance and troubleshooting procedures
recommended in this manual could result in exposure
to electrical, mechanical or other potential safety
hazards. Always refer to the safety warnings provided
throughout this manual concerning these procedures.
When possible, disconnect all electrical power
including remote disconnect and discharge all energy
storing devices such as capacitors before servicing.
Follow proper lockout/tagout procedures to ensure the
power can not be inadvertently energized. When
necessary to work with live electrical components, have
a qualified licensed electrician or other individual who
has been trained in handling live electrical components
perform these tasks. Failure to follow all of the
recommended safety warnings provided, could result in
death or serious injury.